Skip to main content
MuggleVision

Operations and production

Production Management

From work order to production run, from planning to the shop floor: every production step on one platform.

Who it is forProduction planningShop-floor and shift leadsProduction managersMaterials and purchasing teams

What you can do

Production Management

MuggleVision Production brings work orders, BOMs and routings, the planning board, material requirements, production runs and the shop-floor screen onto the same records.

  1. 01

    Work orders

    Open work orders tied to the bill of materials and routing, then record material consumption and finished output.

  2. 02

    BOMs and routings

    Define recipes, operation steps and work centres in one place.

  3. 03

    Capacity-based planning

    Sequence demand against work-centre capacity and see material shortages before you commit.

  4. 04

    Packing and labels

    Build cartons and pallets at the packing station and print labels on the spot.

  5. 05

    Traceability

    Trace forward and backward from raw-material lot to shipped product.

  6. 06

    Engineering changes

    Record BOM and routing changes and put them into effect after approval.

Today → with MuggleVision

What it solves, what changes?

TodayWith MuggleVision
✕Work orders tracked in spreadsheets and on paper
✓One flow from sales order to work order and production run
✕No view of which jobs are affected when a machine stops
✓Readiness and machine-conflict visibility in work-center queues
✕Material shortages noticed only after production starts
✓BOM-based make / buy suggestions
✕Consumption, output and scrap not recorded on the shop floor
✓Barcode material scanning and recorded production data on the shop floor

Works with the platform

Same records, same permissions.

This module runs on the same platform as your other modules and shares data. You can combine it with HR, CRM, finance, or other modules without separate systems.

Request a demo for Production Management

Request a demo to see your production flow with your own work centers and products.

Frequently asked questions

Does it schedule automatically?

No, it is not an automatic scheduling engine. The planner sequences jobs in work-center queues; the system shows material readiness and machine conflicts and suggests free slots.

Does it read data from machines?

There is no live PLC or sensor connection today. Production and downtime data are recorded on the shop-floor screen, on mobile and by barcode scanning.

Are material requirements calculated?

Yes. Material requirements are calculated from BOMs; shortages get a make or buy suggestion that becomes a work order or purchase request. It is not a full MRP II.