Work orders and production tracking
Work orders are created from sales orders or the demand queue; BOM and routing are linked to the work order. Production runs record material consumption, output and scrap.
Production management
Work orders, planning, materials, the shop floor, quality and traceability run on the same records. Everyone sees the same status, with fewer sheets, papers and chat threads.
Today
Work orders in a spreadsheet, job cards on paper, downtime in a chat group, certificates in a folder. MuggleVision brings them onto the same work order and the same lot.
Planning
Work orders are queued per work center, with material and quality readiness on every job. When a machine stops, affected jobs are flagged and a free queue is suggested. The planner decides.
Not an automatic scheduling engine: the planner confirms every sequence and move.
Material requirements
A sales order is exploded through its BOM; stock and reserved quantities are netted. Shortages get a “make” or “buy” suggestion that becomes a work order or a purchase request in one step.
Shop floor
Operators pick their machine, open the next job, scan the input material, and see parameters and instructions. A job cannot be completed before the quality gate is passed.
Check the machine and material, then start
StartQuality
Inspection measurements are checked against the tolerance band. On a deviation the lot goes on hold, a non-conformance is opened, an authorized person decides and the corrective action is tracked as a task.
Traceability
Every production run records the coil it consumed and the lot it produced. Trace backwards from a customer complaint or forwards from a bad heat in a few clicks.
The complained shipment came from lot L-7781; the lot from coil B-24117, the coil from heat H-8812.
add-on The traceability hub is an add-on module.
Visibility
The control tower shows jobs that need attention, material readiness and work-center load together. OEE and downtime analysis are calculated from recorded runs and downtime; missing data shows as “no data”, never zero.
There is no live machine (PLC / sensor) connection; values come from recorded data.
Connected work
Maintenance, subcontracting and mobile records appear together in this work order’s history.
Packaging
The core modules cover work orders, planning, production runs, the shop floor and quality. Add-ons are enabled separately; all of them use the same records.
Plan today’s work, be ready for tomorrow’s orders.
All company names, people, machines and figures on this page are sample data, not real customer data.
Work orders are created from sales orders or the demand queue; BOM and routing are linked to the work order. Production runs record material consumption, output and scrap.
Manual planning with work-center queues, material and quality readiness, machine time windows and conflict checks. Material requirements are calculated from BOMs.
Inspection, holds, non-conformance and calibration live on the same platform. Lot genealogy traces from raw material to customer.
No. Today there is no live PLC or sensor connection. Production, downtime and measurement data are recorded on the shop-floor screen, on mobile and by barcode scanning; OEE is calculated from these records.
No, it is not an automatic scheduling engine. The planner sequences jobs in work-center queues; the system shows material readiness and machine conflicts and suggests free slots.
There is BOM-based material requirements calculation with make / buy suggestions that become work orders or purchase requests. It is not a full MRP II.
It works with warehouse and branch scope. A consolidation feature that merges several plants on one screen does not exist today.
Production and Quality are the core modules. Traceability, packing, dispatch, mobile production, production analytics and inspection plans are add-ons enabled separately.