Inspections and control plans
Incoming, in-process and final inspections follow versioned control plans; measurements are evaluated against tolerance on entry.
Quality management
Inspections follow the control plan and measurements are compared with tolerances. A batch that fails is held in stock, an authorised person decides, and a nonconformance opens. In production, work does not move past a quality step until it passes.
Today
Measurements on paper forms, the control plan in a folder, nonconformances in Excel, calibration dates on the wall, held goods set aside with a label. MuggleVision brings them onto the same product, batch and record.
Inspection
Incoming, in-process and final inspections open from the control plan. Numeric measurements are checked against lower and upper limits; visual and yes/no checks use their own rule. A failed inspection goes to re-inspection or a nonconformance.
Control plan CP-018 · v4 · approved version
Measurements are entered on screen or on mobile; there is no direct data capture from measuring devices.
Holds and decisions
Stock awaiting quality or failing inspection is held; available stock is physical stock minus reserved and held quantities. An authorised person decides on quarantine, scrap, rework or deviation; the person who records is not the one who decides.
The technician records the finding; decision buttons show only to those allowed to decide.
A batch used under deviation is never shown as “passed”; the decision stays on record.
Nonconformance
Nonconformances open from an inspection or by hand, move step by step, and are tracked in a hub by priority, age and owner. They link to corrective and preventive action records.
The corrective and preventive action (CAPA) module is part of the HSE package.
Calibration
Measuring devices are kept with a calibration register and calendar; devices due and overdue are visible. If a calibration turns out bad, impact analysis lists the inspections done with that device.
When the calibration result is recorded, impact analysis lists the inspections done with this device.
Quality in production
A required quality step on the production route cannot be passed until the inspection passes or an authorised deviation is approved. Quality decisions can be opened from the production order.
Management
Quality control tower, measurement series and out-of-spec Pareto, nonconformance indicators and calibration status in one place.
Control limits are drawn when configured.
For the team
Versioned with draft, approval and active steps; assigned to products, operations and work centres.
Inspection, nonconformance, calibration and decision screens on the phone.
Versioned documents, read confirmations and access logs.
Customer complaints show with their quality record.
Packages
The Quality module covers inspections, control plans, holds, dispositions, nonconformances and calibration. It works on the same product and batch as production, stock and purchasing.
Keep inspection results, stock holds and instrument calibration tied directly to each product and batch.
Companies, people and figures on screen are sample data.
Incoming, in-process and final inspections follow versioned control plans; measurements are evaluated against tolerance on entry.
Stock awaiting quality leaves available stock; an authorised person decides on quarantine, scrap, rework or deviation.
Nonconformances open from inspections or by hand, are tracked in a hub and linked to corrective and preventive action.
A calibration calendar with impact analysis for measuring devices; a required quality gate on the production route.
Numeric measurements are checked against lower and upper limits; visual and yes/no checks use their own rule. A failed inspection goes to re-inspection or a nonconformance.
No. Available stock is physical stock minus reserved and held quantities; a held batch does not reach sales or production.
Nonconformances link to corrective and preventive action records. The CAPA module is part of the HSE package.
Measurement series, breakdowns and an out-of-spec Pareto are shown; control limits are drawn when configured. Cp/Cpk and automatic control limits are not included.
No, these tools are not in the product.
No. Measurements are entered on screen or on mobile.