Fault reporting with time targets
Faults are reported by QR, web form, mobile app or portal. Similar records are flagged, the assignment rule routes them to a technician, and response and resolution times are tracked and escalated.
Maintenance and asset management
Asset cards, fault reports, maintenance work orders, preventive maintenance, spare parts and downtime run on the same record. Operators scan a QR, technicians close the job on the phone, managers see MTBF and MTTR.
Today
Faults come by phone or chat, the maintenance plan lives in a sheet, parts used in a notebook, warranty papers in a folder. MuggleVision brings them onto the same machine, the same work order and the same stock.
Faults
An operator scans the QR on the machine or fills in the form; employees, customers and even unregistered visitors can report. Similar faults are flagged, the assignment rule finds the technician, and response and resolution timers start. The technician consumes parts from stock and a supervisor verifies.
The time monitor runs every 15 minutes; records nearing or past their target are escalated.
Preventive maintenance
Plans run daily, weekly, monthly, yearly or by running hours. Calendar plans open a work order ahead of the due date; meter plans open one when a reading crosses the threshold. The checklist and default technician come from the plan.
18 hours to threshold. The work order opens itself when a reading crosses it.
Calendar plans open work orders ahead of the due date; checklist and technician come from the plan.
Asset card
Criticality, location, serial number, warranty and document expiry dates, depreciation and current value, maintenance history and cost, the assets it depends on. Custody and counts sit on the same card.
Downtime and KPIs
Downtime links to the production machine, work center and work order. MTBF and MTTR come from fault records; plan adherence, cost and utilization reports sit together. Maintenance books planned downtime, production sees it.
Calculated from fault records.
OEE is calculated in the production module; maintenance supplies downtime and fault data.
Technician
Technicians see their own job list on the phone; they start a job, hold it for parts or approval, fill in the checklist and close it. Fault actions are saved offline and sent once back online.
For the team
Contractors are assigned to work orders; their performance and cost are tracked.
Open a claim for a fault within warranty and track its status.
If a part is missing, raise a purchase request from the work order.
An assigned work order shows up in the technician’s My work.
Packages
The Assets module covers asset cards, maintenance work orders, preventive maintenance and downtime; the Faults module covers reporting, assignment and time targets. Other modules are enabled separately and work on the same machine.
Track fault reports, scheduled maintenance and spare parts usage on one asset record.
Companies, machines and figures on the screens are sample data.
Faults are reported by QR, web form, mobile app or portal. Similar records are flagged, the assignment rule routes them to a technician, and response and resolution times are tracked and escalated.
Calendar and running-hour plans open work orders on their own. Checklists, default technicians and the maintenance calendar hang off the plan.
Parts used on a work order are consumed from the warehouse, and labour and cost are recorded; if a part is missing, a purchase request is raised from the work order.
Each asset keeps its warranty, documents, depreciation and maintenance history on one card. Downtime links to production, and MTBF and MTTR come from fault records.
Employees from the web and mobile app, customers from the portal, and unregistered visitors through the QR on the machine or a public form. The public form has rate limits and photo upload.
Yes. Calendar plans open a work order a set number of days before the due date; meter plans open one when a reading crosses the threshold.
Yes. Parts used on a work order are consumed from the warehouse, which needs stock and warehouse permission. Reordering runs through general stock replenishment.
OEE is calculated in the production module. Maintenance supplies downtime, fault, MTBF and MTTR data; downtime links to the production machine and work order.
Fault field actions are saved offline and sent later. Maintenance work order actions need a connection.
Similar-fault, category and priority suggestions and resolution and reply drafts are rule-based. The language-model fault assistant is off by default and enabled by an admin; drafts are applied only with the user’s confirmation.